Monday, November 19, 2018

The Big Dig a Tent and the New 9th Green


A full sized excavator prepping the deep end of the pool.

Here is a photo looking south where the pool lap lanes will be.  The area was excavated, a liner was installed then stone was layered on top.  This enclosed tent will help regulate the air temperature during the construction of the pool.

A nice prospectus of the new 9th green and the pool complex location. 


This shows the site of the new par 3 9th green.  The green and three bunkers that have been shaped.  Our recent snow accumulation of 3-4 inches slowed up our progress on 9 green a bit but certainly not the pool progress.  More snow came down Friday morning and we are hoping to get the greens mix installed after a warming trend arrives around Thanksgiving.