Construction of the pool foundation in the heated tent begins the week of December 3rd.  

Drains were installed in the deep end of the pool last week.


This is a view from the deep end looking north.  The yellow temporary heater is where the shallow end will be.
This shows you a really good perspective of where the pool house will be.  The footings were poured this week and block walls are being installed.  These two gentleman are standing in the staff/lifeguard room. The kitchen is on the east side towards the tee.
Pool House - left to right - kitchen, breezeway entrance hallway, lockers rooms, mechanical room
  
Construction for the east wing expansion started this week scraping the topsoil off of the old first tee, removing the blacktop cart path and creating space to the south for sidewalks and cart paths.

This is the location where two indoor simulators will be.  Access to them will be from inside the 19th hole.

This a view from the back banquet room.  From here you will have access to the upper patio and below the patio on the first floor will be the fitness center and the pro shop.
 
I think from this spot near the corner of the tennis courts you will be looking at the fitness center windows on the first floor once completed.

Here is a panoramic looking back at the east expansion.