The pool house now has the shingles installed and they are working on the plumbing and electrical. |
Here is a view of the pool house entrance. The opening on the left will be for self serve water and ice when you make the turn to the back. |
This is the 1/2 house service window which faces the 10th tee and will have outside tables and cart parking. |
A view of the lap pool looking south. The activity pool floor and walls have been poured under the tent on the left. |
A picture outside the dining room looking east at the pro shop window brick cut out. |
Steel beams being installed for the clubhouse addition. |