| This is the location and curved shape of the 12 person hot tub spa showing the drain at the bottom and stone for the subbase. |
| The 8th green expansion is open for play. We will be adding soil to the bunkers and sodding the green bank this week. |
| The east stairs to the upper patio. |
| This load is for the storm water holding and drainage system which will be underground below the pool deck. |
| Another picture of the hot tub spa location looking north. |
No comments:
Post a Comment