Wednesday, October 30, 2019

The Beginning of the Finished Product



The brick paver project finished up Thursday the 24th.

We installed sod between the collar and the bricks on the 29th.

 
The new putting green is coming in very well for the unseasonably cool and wet weather.  The winter tarp arrived today and we'll install it just before winter hits, normally around Thanksgiving.
 

Another finish product view.


The first view of the simulators from the 19th hole.  The temporary wall came down exposing the black walled sims.  The small wall has been framed and cocktail tables will sit along that wall for each simulator group.  Drop ceiling frame installed this morning.

A better view of the simulators with stairs now too.

A view inside the fitness room looking east.  Walls and ceilings have been painted and the floor was installed last night.  


The fitness room west wall view with a protective cover on the new flooring.

The drop ceiling has been installed in the pro shop, walls are painted and ceiling tile waits for heat duct work.


A view from the valley.  We sodded the steep part of the bank off of the 1st tee and hydroseeded the flat lower level.


Got my first look into the bathrooms on the outside patio and they are nearly completed.